so looks like proceeding at last !

but just how many pages of docs, no wonder it takes so frigging long in this country 

FINALLY! Sad its taken this long + I just moved out of Birmingham. Really gutted I wont be here anymore to see or use this once its built. It would of been very useful for university had this been built months - years ago!

LOL! No kidding. 

ian robathan said:

so looks like proceeding at last !

but just how many pages of docs, no wonder it takes so frigging long in this country 

Sign on the central reservation near to the university.

Workers are on site today at the university end taking measurements. They reckon it will be a couple of months before there's much to see. 

LS said:

Sign on the central reservation near to the university.

I rode the section from the Priory Road junction to the University this afternoon.  Evidence of tree-felling (some still a work in progress), and a pretty little row of survey flags (and occasional civil engineering graffiti where tarmac is present) along the central reservation.

Also big holes in the pavement at the Pebble Mill Road junction, but these may be unrelated utility works?

Some photos of current progress on twitter: https://twitter.com/BCRbirmingham/status/984065109407432704/

They seem to be laying the path without digging into the soil, beyond removing the turf.  Is that a good idea?

I noticed it looks like it will be raised about a foot above the grass and wonder if there will be edges to reduce the risk of riding off the side. 

Work should begin on the Belgrave middle way crossing next week.

Kim said:

Some photos of current progress on twitter: https://twitter.com/BCRbirmingham/status/984065109407432704/

They seem to be laying the path without digging into the soil, beyond removing the turf.  Is that a good idea?

I went and found the original artist's impression, and that just showed magic paint, which is clearly not the solution.  It's going to need a proper kerb, preferably with enough of a slope that bicycles don't tramline against it.  The cynic in me expects the usual wooden edging that hides in the leaf-litter and makes you fall off your bike.

LS said:

I noticed it looks like it will be raised about a foot above the grass and wonder if there will be edges to reduce the risk of riding off the side.

Dates...

Any updates/photos on the new cycle highway? Not living in Birmingham anymore sad to say so I have not been able to witness the building of the new cycle lane. I hope its going well? Looking forward to having a ride on soon as it is completed!

Reply to Discussion

RSS

Site Sponsors


Latest Activity

Steve replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"You would think that it would be pretty predictable that metal plate would be slippery when wet.…"
1 hour ago
LS replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"It's better that it rained hard on Friday and was found to be slippy while contractors were…"
2 hours ago
Gaz is now a member of Birmingham Cyclist
5 hours ago
doug salmon replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"Nobody apparently. Website still 25th open at 5pm. "
16 hours ago
john butler replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"thanks for update LS..but who is responsible for keeping the public informed about these…"
20 hours ago
LS replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"After the heavy rain yesterday the metal plates were found to be slippy. They are applying an…"
20 hours ago
Robert Jones replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"It was still closed late yesterday evening. "
yesterday
Andrew Walsh replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"Hi all Is it open now?  I thought people were planning a party or something to celebrate, if…"
yesterday
Tom H commented on LS's photo
Thumbnail

NCN5 at Dogpool Lane

"they are tighter, you can see from the concreting underneath that they are significantly wider than…"
Thursday
On Your Bike replied to doug salmon's discussion On Your Bike
"No problem. Any time."
Thursday
Andrew W commented on LS's photo
Thumbnail

NCN5 at Dogpool Lane

"I think they are a lot tighter now.  Almost had a clipless moment going South yesterday. …"
Thursday
Ryan Stait replied to john butler's discussion A38 cycle route
"Few new lane markings on Bristol St/Belgrave Middleway junction when I came out of town this…"
Wednesday
Kim replied to john butler's discussion A38 cycle route
"This is a problem with shared paths generally.  The signs and markings are generally…"
Wednesday
LS replied to Chad's discussion GU Canal (Tyseley)
"I cycled the Cole Valley route to work for 13 years which included the short stretch of canal at…"
Wednesday
Chad replied to Chad's discussion GU Canal (Tyseley)
"I have cycled this route for nigh on 20 years and it is only since the upgrade that I have ever…"
Wednesday
James Russell might attend LS's event
Thumbnail

HSBC Let's Ride Birmingham at Route to be confirmed

June 10, 2018 from 9am to 4pm
What used to be called SkyRide / BikeFest / City RideSee More
Tuesday

© 2018   Created by LS.   Powered by

Badges  |  Report an Issue  |  Terms of Service