Birmingham Cyclist

Cycling in and around Birmingham England

Some new consultations...

https://www.birminghambeheard.org.uk

Views: 11734

Reply to This

Replies to This Discussion

I haven't had chance to look at these yet but I notice one has a proposal for dismount signs :-( 

Cheddar Road in Balsall Heath on NCN5. Remove all of the build outs and have a separated two way cycle lane on the park side. Would that work?

https://www.birminghambeheard.org.uk/development/bcr-rv-7/supportin... 

Disappointed to see that they are removing one of the concrete bollards at the end of Cheddar Road. Approach at speed in the wet too far to the right, and feel the adrenaline rush as the bike skips sideways on the wet drains cover just as you thought you had lined yourself up for the gap!

it's a quiet cul de sac, I don;t really see the need for the build outs or a separated cycle lane. the build outs were put in to discourage curb crawlers when cheddar rd was a red light zone afaik, and I don't see why thy are being kept now tbh. Good to see those bollards will go though.

LS said:

Cheddar Road in Balsall Heath on NCN5. Remove all of the build outs and have a separated two way cycle lane on the park side. Would that work?

https://www.birminghambeheard.org.uk/development/bcr-rv-7/supportin... 

That sounds dangerously like common sense!

Darren Cash said:

A change in law on pelicans would be more cost effective than replacing them at cost with new lights and calling it a toucan. Let's face it, the motorist can't see any difference on approach.

These look like very piecemeal interventions - not sure they amount to any sort of cycling revolution; maybe they are just  a way of frittering money that should be going to more dramatic interventions elsewhere.

Good point For instance  - re painting existing cycle route markings is not carving new chunks of cycle facility..  is there  not a budget to keep cycle routes up to date ?  Also on the Coventry road island by Asda - why paint shuttering on the road to keep cars clear == why not expand the shared use cycle / pedestrian path

The Warwick Road repainting has already been done. I first noticed it on 15th January. The dismount signs are at the zebra too. Looks like the consultation is just box ticking.

What I noticed at the re-modelling of Stratford Rd / Walford Road TLs was the triangles have ‘raised brick’ decoration, which as any motorcyclist or pedal cyclist knows, is the worst surface to land on after being knocked off.

This shows in ONE brief instant, how completely IGNORANT BCC are of what it’s like riding a two wheeler.

 

I have NO faith in anything BCC propose, and won’t hold out any hope for ANY decent cycling facilities in the area controlled by the BCC clowns.

Perhaps the consultation should look at this video
http://www.upworthy.com/a-dutch-guy-is-disgusted-by-america-but-he-...

On my way to work this morning, the roads were wet with rainwater.

I really thought the council would have been out early to sweep and dry the roads for me so I wouldn't get splashed.

Sounds like the old Alexi Sayle joke, "I've been using that toilet for 15 years and the council still haven't sent anyone around to flush it"

James Lee said:

On my way to work this morning, the roads were wet with rainwater.

I really thought the council would have been out early to sweep and dry the roads for me so I wouldn't get splashed.

Reply to Discussion

RSS

Site Sponsors


Latest Activity

Keith Dodds replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"Who's wondering if they could bunny hop down all that now :-)"
1 hour ago
Peter Leadbetter is now a member of Birmingham Cyclist
2 hours ago
LS replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"I think it will open on Friday 18th May if not sooner."
5 hours ago
UoB Smartmover replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"It's not due to open for another…"
6 hours ago
LS replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"It wasn't two hours ago.  "
21 hours ago
On Your Bike replied to LS's discussion Edgbaston Tunnel Tow Path Widening
"Hello Does anyone know if the towpath is open now? Thanks Adam"
22 hours ago
Robert Jones replied to Robert Jones's discussion Rea Valley Route Stirchley Fordhouse Lane
"Is there any hope of getting anyone from BCC to get involved in this? Any ideas anyone. It's…"
yesterday
Andrew George replied to Andrew George's discussion Any sheffield stands in the Jewelry quarter
"Hello LS, Thanks very much! I replied to that consultation when it was open, as there's a…"
Sunday
LS replied to Andrew George's discussion Any sheffield stands in the Jewelry quarter
"There are 3 stands on the edge of Golden Square behind Rose Villa Tavern. Some at the train/metro…"
Friday
Andrew George posted a discussion

Any sheffield stands in the Jewelry quarter

Hello everyone!I'm hoping to tap into other's knowledge of cycle parking in and around the city…See More
Apr 13
LS posted events
Apr 12
Kim replied to LS's discussion A38 Work to start end of February
"I went and found the original artist's impression, and that just showed magic paint, which is…"
Apr 12
LS replied to LS's discussion A38 Work to start end of February
"I noticed it looks like it will be raised about a foot above the grass and wonder if there will be…"
Apr 11
Kim replied to LS's discussion A38 Work to start end of February
"Some photos of current progress on twitter:…"
Apr 11
Former Highwayman replied to Dave Cox's discussion City Centre Road Improvements good for buses but neglect cycling and walking
"Thanks for the feedback Gents!"
Apr 11
Shivaji Shiva replied to Shivaji Shiva's discussion Trains and Bikes -- Severn Valley Railway
"Thanks everyone - some really helpful tips!"
Apr 9

© 2018   Created by LS.   Powered by

Badges  |  Report an Issue  |  Terms of Service